Record Detail Back
Produktivitas Combined Terminal Trailer Bongkar Muat Petikemas di Teluk Lamong
PT Terminal Teluk Lamong is a subsidiary of Pelindo III which is an expansion of Tanjung
Perak Port which is engaged in container services. The aim of this research is to analyze the
effect of the availability and waiting time of a combined terminal trailer on the loading and
unloading productivity of PT Terminal Teluk Lamong. The problem of this research is the
inadequate number of combined terminal trailers, the occurrence of waiting trucks,
inadequate number of combined terminal trailers, changes in location, weight of containers
transported by CTT, the high level of damage to the combined terminal trailer, difficulty in
spare parts or spare parts. The results showed that there was a significant effect between the
availability and waiting time of CTT on loading and unloading productivity where the
correlation coefficient test showed 0.848 which means that there is a very strong influence.
Meanwhile, the correlation coefficient of determination test shows that the influence between
the availability and waiting time of CTT and loading and unloading productivity is 71.9%
while the remaining 28.1% is influenced by other factors.
Syerehan Maghriba Shalawatika - Personal Name
Darmawan Apriyadi - Personal Name
Aisyah Rahmawati - Personal Name
Darmawan Apriyadi - Personal Name
Aisyah Rahmawati - Personal Name
2407-635X
NONE
electronic file
2021
Jurnal Manajemen Bisnis Transportasi dan Logistik (JMBTL) Vol. 7 No. 1 Januari 2021
https://journal.itltrisakti.ac.id/index.php/jmbtl
LOADING LIST...
LOADING LIST...







