<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="2552">
<titleInfo>
<title><![CDATA[Penyebab Keterlambatan Kegiatan Pengadaan Impor Barang Logistik High Damping Rubber Bearing]]></title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Marthaleina Ruminda Sitorus</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<name type="Personal Name" authority="">
<namePart>Yayuk Dwi Indriani</namePart>
<role><roleTerm type="text">Additional Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes"><![CDATA[mixed material]]></typeOfResource>
<genre authority="marcgt"><![CDATA[bibliography]]></genre>
<originInfo>
<place><placeTerm type="text"><![CDATA[Jakarta]]></placeTerm></place>
<publisher><![CDATA[ITL Trisakti]]></publisher>
<dateIssued><![CDATA[2015]]></dateIssued>
<issuance><![CDATA[monographic]]></issuance>
<edition><![CDATA[]]></edition>
</originInfo>
<language>
<languageTerm type="code"><![CDATA[id]]></languageTerm>
<languageTerm type="text"><![CDATA[Indonesia]]></languageTerm>
</language>
<physicalDescription>
<form authority="gmd"><![CDATA[electronic file]]></form>
<extent><![CDATA[]]></extent>
</physicalDescription>
<note>PT. Wijaya Karya (Persero) Tbk is a construction company that has 6
subsidiaries and 10 operating departments. In conducting its business, the
company is applying sourcing materials locally and internationally. One of
them is the procurement of goods imported High Damping Rubber Bearings
(HDRB) that serves as the foundation of anti-earthquake building structures
and cannot be produced inside the country. Using a causal diagram (fishbone
diagram; Dr. Kaoru Ishikawa), it was found that the factors causing delays in
goods (HDRB) is due to production machinery, human resources, time, method,
and money.</note>
<subject authority=""><topic><![CDATA[fishbone diagram]]></topic></subject>
<subject authority=""><topic><![CDATA[Procurement]]></topic></subject>
<classification><![CDATA[NONE]]></classification><identifier type="isbn"><![CDATA[]]></identifier><location>
<physicalLocation><![CDATA[Repository Local Content Institut Transportasi dan Logistik TRISAKTI]]></physicalLocation>
<shelfLocator><![CDATA[]]></shelfLocator>
</location>
<slims:digitals>
<slims:digital_item id="2948" url="" path="/971-4629-1-SM.pdf" mimetype="application/pdf"><![CDATA[Artikel: Penyebab Keterlambatan Kegiatan Pengadaan Impor Barang Logistik High Damping Rubber Bearing]]></slims:digital_item>
</slims:digitals><recordInfo>
<recordIdentifier><![CDATA[2552]]></recordIdentifier>
<recordCreationDate encoding="w3cdtf"><![CDATA[2023-07-05 16:22:47]]></recordCreationDate>
<recordChangeDate encoding="w3cdtf"><![CDATA[2023-07-20 14:28:16]]></recordChangeDate>
<recordOrigin><![CDATA[machine generated]]></recordOrigin>
</recordInfo></mods></modsCollection>