Record Detail Back

XML

Ketepatan Waktu dan Okupansi Terhadap Kinerja Kereta Api Joglosemarkerto


The purpose of the study are to analyse the train’s punctuality and load factor and to verify the effect of the train’s punctuality to its load factor. The study is about the Joglosemarkerto rail transport for 62 days or 2 months from December 2018 to Januari 2019. The data used in this study was a secondary data based on the delay and load factor of daily departure of the rail transport. The data analysis were using two techniques which were descriptive quantitative and linear regression. The result shows that the negative effect of punctuality to load factor due to the delay that giving negative effect to the load factor. The equation from the effect of punctuality to load factor was shown in Y = 310,790 – 1,630X.
Masjraul Hidayat - Personal Name
Usri Jati Hastuti - Personal Name
M. Iqbal Firdaus - Personal Name
2407-635X
NONE
electronic file
ITL Trisakti
2020
Jakarta
Jurnal Manajemen Bisnis Transportasi dan Logistik (JMBTL) Vol. 6 No. 2 Mei 2020 https://journal.itltrisakti.ac.id/index.php/jmbtl
LOADING LIST...
LOADING LIST...