Record Detail Back
The Operational Delay With on Time Performance Terminal 3 Soekarno Hatta Airport (Case Study of PT Garuda Indonesia)
The purpose of this study is to examine operational delay with on time
performance at PT Garuda Indonesia located in Terminal 3. The problem of this
study is there are delay due to flight operations and airport facilities. The study
collected the data from the company and by doing the field research. Simple and
multiple regression analysis, correlation coefficients, determinant coefficients and
hypothesis testing were used to analyse the data. The results show that there is a
negative and strong relationship due to Flight Operation with On Time
Performance. The coefficient of determination is 92%, the results of hypothesis
test (t-test) have a significant positive effect. The connection of delay due to
Airport Facilities with On Time Performance is Y = 92,549 + (-0,123X) from the
regression equation looks down (negative). The correlation coefficient r = 0.602
has a positive and strong relation. The coefficient of determination is 36.2%, the
results of hypothesis testing (ttest) have a significant relationship. The connection
of delay due to Flight Operation and Airport Facilities to On Time Performance is
Y = 98,274 + (-1,772 X₁ ) + (-0,011 X₂ ). The correlation coefficient r = 0.960
means a positive and very strong relationship. The coefficient of determination is
equal to 92.2%. Hypothesis test results (f test) have proven a positive and strong
relationship.
Mustikasari - Personal Name
Aditya Wardhana - Personal Name
Lut Mafrudoh - Personal Name
Reni Dian Octaviani - Personal Name
Novi Indah Susanthi - Personal Name
Aditya Wardhana - Personal Name
Lut Mafrudoh - Personal Name
Reni Dian Octaviani - Personal Name
Novi Indah Susanthi - Personal Name
2622-5778
NONE
electronic file
English
ITL Trisakti
grostlog 2018
LOADING LIST...
LOADING LIST...







