<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="1455">
<titleInfo>
<title><![CDATA[Penerapan Metode Analythic Hierarchy Process untuk  Pengambilan Keputusan Pemilihan Desain Jembatan Kereta Api]]></title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Heriyanto Wibowo</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<name type="Personal Name" authority="">
<namePart>Sinung Tri Nugroho</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes"><![CDATA[mixed material]]></typeOfResource>
<genre authority="marcgt"><![CDATA[bibliography]]></genre>
<originInfo>
<place><placeTerm type="text"><![CDATA[]]></placeTerm></place>
<publisher><![CDATA[ITL Trisakti]]></publisher>
<dateIssued><![CDATA[2020]]></dateIssued>
<issuance><![CDATA[monographic]]></issuance>
<edition><![CDATA[]]></edition>
</originInfo>
<language>
<languageTerm type="code"><![CDATA[id]]></languageTerm>
<languageTerm type="text"><![CDATA[Indonesia]]></languageTerm>
</language>
<physicalDescription>
<form authority="gmd"><![CDATA[electronic file]]></form>
<extent><![CDATA[https://journal.itltrisakti.ac.id/index.php/jtt/ar]]></extent>
</physicalDescription>
<note>Padalarang - Purwakarta line track is a very crowded but potential track since it connects
Jakarta - Bandung. Argo Parahyangan train and freight train are passing through this
track. Therefore, it is crucial to build double track lane. However, it is difficult to execute
due to a wide and deep river which requires a new bridge with a complex high cost
construction. That is the reason why, an in-depth evaluation of the bridge design is needed.
In selecting the bridge design, the Analytical Hierarchy Process was used as the selection
method. The method would applied a four-level developed structure: the first level was the
goal of choosing the Optimum Bridge Design, the second level was the people involved, the
third level was the evaluation criteria, the last level was the alternative bridge to be built.
The data was taken from the questionnaires filled by six respondents of the railway
bridge's construction experts. The results show that the order of the bridge's design
selection is as follows: 0.395 for concrete bridges; 0.213 for steel arch bridges; 0.199 for
steel frame bridges; and 0.194 for cable bridges.</note>
<subject authority=""><topic><![CDATA[railway bridge]]></topic></subject>
<subject authority=""><topic><![CDATA[optimum bridge design]]></topic></subject>
<subject authority=""><topic><![CDATA[decision-making]]></topic></subject>
<subject authority=""><topic><![CDATA[Analytical Hierarchy Process]]></topic></subject>
<classification><![CDATA[NONE]]></classification><identifier type="isbn"><![CDATA[27229599]]></identifier><location>
<physicalLocation><![CDATA[Repository Local Content Institut Transportasi dan Logistik TRISAKTI]]></physicalLocation>
<shelfLocator><![CDATA[]]></shelfLocator>
</location>
<slims:digitals>
<slims:digital_item id="517" url="" path="/Heriyanto _ Artikel Jurnal 2.pdf" mimetype="application/pdf"><![CDATA[artikel]]></slims:digital_item>
<slims:digital_item id="518" url="" path="/Heriyanto W - Review Jurnal 2.pdf" mimetype="application/pdf"><![CDATA[review sejawat]]></slims:digital_item>
</slims:digitals><recordInfo>
<recordIdentifier><![CDATA[1455]]></recordIdentifier>
<recordCreationDate encoding="w3cdtf"><![CDATA[2021-01-12 15:06:19]]></recordCreationDate>
<recordChangeDate encoding="w3cdtf"><![CDATA[2021-01-12 15:06:19]]></recordChangeDate>
<recordOrigin><![CDATA[machine generated]]></recordOrigin>
</recordInfo></mods></modsCollection>