<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="1449">
<titleInfo>
<title><![CDATA[Evaluasi Kapasitas Eksisting Pelabuhan Bongkar Batubara Terhadap Peningkatan Ukuran Tonase Kapal]]></title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Maria Angelin Naiborhu</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes"><![CDATA[mixed material]]></typeOfResource>
<genre authority="marcgt"><![CDATA[bibliography]]></genre>
<originInfo>
<place><placeTerm type="text"><![CDATA[Jakarta]]></placeTerm></place>
<publisher><![CDATA[ITL Trisakti]]></publisher>
<dateIssued><![CDATA[2020]]></dateIssued>
<issuance><![CDATA[monographic]]></issuance>
<edition><![CDATA[]]></edition>
</originInfo>
<language>
<languageTerm type="code"><![CDATA[id]]></languageTerm>
<languageTerm type="text"><![CDATA[Indonesia]]></languageTerm>
</language>
<physicalDescription>
<form authority="gmd"><![CDATA[electronic file]]></form>
<extent><![CDATA[]]></extent>
</physicalDescription>
<note>Coal unloading ports at a steam power plant (PLTU), the size of barge or ship is determined based on the needs of coal consumption each month and the safety factors that considers period of downtime due to weather factor. The percentage of downtime when the design is calculated to be distributed in a period of time can last for several weeks and cause a break in the supply of coal to the power plant in a long period of time. Regarding this condition, it is necessary to use bigger ship capacity. The size of ships served in some PLTU must be evaluated. This article discusses a case of port capacity evaluation in one of PLTU in Southern Coast of Java if it was able to serve a ship with bigger size. An evaluation to the capacity of pier pole structure was done by using SAP2000 software and the evaluation of pier dimension, fender and bollard capacity, as well as the depth and the area of existing turning basin that have been done by using port design standards. The
result of the evaluation is an early indication for the size of ships which still can be served
by the existing port PLTU.</note>
<subject authority=""><topic><![CDATA[turning basin]]></topic></subject>
<subject authority=""><topic><![CDATA[bollard]]></topic></subject>
<subject authority=""><topic><![CDATA[fender]]></topic></subject>
<subject authority=""><topic><![CDATA[coal loading port]]></topic></subject>
<classification><![CDATA[NONE]]></classification><identifier type="isbn"><![CDATA[27229599]]></identifier><location>
<physicalLocation><![CDATA[Repository Local Content Institut Transportasi dan Logistik TRISAKTI]]></physicalLocation>
<shelfLocator><![CDATA[]]></shelfLocator>
</location>
<slims:digitals>
<slims:digital_item id="505" url="" path="/Maria Angelin _ Artikel Jurnal 1.pdf" mimetype="application/pdf"><![CDATA[artikel]]></slims:digital_item>
<slims:digital_item id="506" url="" path="/Maria Angelin - Review Jurnal 1.pdf" mimetype="application/pdf"><![CDATA[review sejawat]]></slims:digital_item>
</slims:digitals><recordInfo>
<recordIdentifier><![CDATA[1449]]></recordIdentifier>
<recordCreationDate encoding="w3cdtf"><![CDATA[2021-01-12 13:57:56]]></recordCreationDate>
<recordChangeDate encoding="w3cdtf"><![CDATA[2021-01-12 13:58:13]]></recordChangeDate>
<recordOrigin><![CDATA[machine generated]]></recordOrigin>
</recordInfo></mods></modsCollection>