<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="1443">
<titleInfo>
<title><![CDATA[Penerapan Metode Analythic Hierarchy Process untuk Pengambilan Keputusan Pemilihan Desain Jembatan Kereta Api]]></title>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Heriyanto Wibowo</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<name type="Personal Name" authority="">
<namePart>Sinung Tri Nugroho</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes"><![CDATA[mixed material]]></typeOfResource>
<genre authority="marcgt"><![CDATA[bibliography]]></genre>
<originInfo>
<place><placeTerm type="text"><![CDATA[Jakarta]]></placeTerm></place>
<publisher><![CDATA[ITL Trisakti]]></publisher>
<dateIssued><![CDATA[2020]]></dateIssued>
<issuance><![CDATA[monographic]]></issuance>
<edition><![CDATA[]]></edition>
</originInfo>
<language>
<languageTerm type="code"><![CDATA[id]]></languageTerm>
<languageTerm type="text"><![CDATA[Indonesia]]></languageTerm>
</language>
<physicalDescription>
<form authority="gmd"><![CDATA[electronic file]]></form>
<extent><![CDATA[digital]]></extent>
</physicalDescription>
<note>Padalarang - Purwakarta line track is a very  rowded but potential track since it connects
Jakarta - Bandung. Argo Parahyangan train and freight train are passing through this
track. Therefore, it is crucial to build double track lane. However, it is difficult to execute
due to a wide and deep river which requires a new bridge with a complex high cost
construction. That is the reason why, an in-depth evaluation of the bridge design is needed.
In selecting the bridge design, the Analytical Hierarchy Process was used as the selection
method. The method would applied a four-level developed structure: the first level was the
goal of choosing the Optimum Bridge Design, the second level was the people involved, the
third level was the evaluation criteria, the last level was the alternative bridge to be built.
The data was taken from the questionnaires filled by six respondents of the railway
bridge's construction experts. The results show that the order of the bridge's design
selection is as follows: 0.395 for concrete bridges; 0.213 for steel arch bridges; 0.199 for
steel frame bridges; and 0.194 for cable bridges.</note>
<subject authority=""><topic><![CDATA[jembatan kereta api]]></topic></subject>
<subject authority=""><topic><![CDATA[pengambilan keputusan]]></topic></subject>
<subject authority=""><topic><![CDATA[desain jembatan terbaik]]></topic></subject>
<subject authority=""><topic><![CDATA[analytic hierarchy process]]></topic></subject>
<classification><![CDATA[NONE]]></classification><identifier type="isbn"><![CDATA[27229599]]></identifier><location>
<physicalLocation><![CDATA[Repository Local Content Institut Transportasi dan Logistik TRISAKTI]]></physicalLocation>
<shelfLocator><![CDATA[digital]]></shelfLocator>
</location>
<slims:digitals>
<slims:digital_item id="493" url="" path="/Sinung Tri N. _ Artikel Jurnal 1.pdf" mimetype="application/pdf"><![CDATA[artikel]]></slims:digital_item>
<slims:digital_item id="531" url="" path="/Sinung Tri N. - Review Jurnal 1 _ 11.1.21.pdf" mimetype="application/pdf"><![CDATA[review sejawat sinung tri]]></slims:digital_item>
</slims:digitals><recordInfo>
<recordIdentifier><![CDATA[1443]]></recordIdentifier>
<recordCreationDate encoding="w3cdtf"><![CDATA[2021-01-12 10:43:04]]></recordCreationDate>
<recordChangeDate encoding="w3cdtf"><![CDATA[2021-01-12 16:38:17]]></recordChangeDate>
<recordOrigin><![CDATA[machine generated]]></recordOrigin>
</recordInfo></mods></modsCollection>